Business Analyst interview questions

100 real questions with model answers and explanations for Business Analyst candidates.

See a Business Analyst resume example

Practice with flashcards

Spaced repetition · Hunter Pass

Questions

stakeholder-managementrequirements-elicitationonboarding

I would sequence discovery by risk and dependency rather than schedule 12 disconnected conversations.

  • In days 1 and 2, I would map each stakeholder to the onboarding decisions, evidence, and systems they own, then mark compliance and operations as mandatory inputs.
  • I would review the current forms, policy documents, funnel data, and 20 recent applications before interviews so questions test known gaps instead of asking people to restate the process.
  • I would run role-specific interviews in week 1, a cross-functional playback in week 2, and reserve week 3 for unresolved rules, acceptance criteria, and sponsor approval.

Why interviewers ask this: The interviewer is assessing whether the candidate can turn a crowded stakeholder landscape and a fixed deadline into a risk-based elicitation plan.

stakeholder-managementstakeholder-mappingcommunication

I would use the map to set the depth and cadence of engagement, not to exclude low-power users.

  • The procurement director and finance controller have high power, so I would validate objectives, budget rules, and final decisions with them twice during the 10 days.
  • Buyers and approvers have high interest but less formal power, so I would observe 6 real purchase requests and test detailed workflows with them.
  • I would record an owner and contact frequency for every quadrant, then revisit the map when a stakeholder gains decision authority or a hidden dependency appears.

Why interviewers ask this: A strong answer shows that stakeholder mapping changes concrete elicitation activities while still protecting the voice of operational users.

racidecision-rightsdesign

I would facilitate a RACI around 8 to 12 decisions and deliverables, not assign authority myself or map every project task.

  • For pricing rules, refunds, invoice content, data retention, and release acceptance, I would propose one Accountable candidate and ask the sponsor or process-governance owner to confirm that authority; the people doing the analysis or implementation would be Responsible.
  • I would review overloaded rows, especially any with two Accountable people or all 14 marked Consulted, because those patterns predict delayed decisions.
  • I would test the matrix in a 45-minute session using two real decisions; if the gap is decision rights rather than delivery responsibility, I would use DACI or RAPID instead and record its decision process.

Why interviewers ask this: The interviewer wants evidence that the candidate can use RACI to remove decision ambiguity rather than produce a decorative stakeholder table.

facilitationstakeholder-interviewsconcurrency

I would combine the techniques because each exposes a different part of the process.

  • I would observe 8 agents handling at least 24 calls to capture workarounds, screen switching, and steps that policy owners may not know about.
  • I would interview the 3 policy owners separately to clarify exceptions and controls that agents cannot decide in a group workshop.
  • I would use a workshop with agents and supervisors to validate the as-is map and prioritize gaps, then confirm disputed details against recordings and system timestamps before day 15.

Why interviewers ask this: The interviewer is checking whether the candidate selects elicitation techniques from the information needed rather than defaulting to meetings.

stakeholder-managementonboardingcommunication

I would establish decision rights before asking the group to approve detailed requirements.

  • I would create a decision register for identity checks, contract eligibility, service levels, support ownership, and exceptions, naming one decision owner and a due date for each.
  • I would ask the sponsor to resolve unowned or multiply owned decisions within 48 hours, presenting the delivery impact of leaving each one open.
  • Every workshop conclusion would be recorded as a decision, assumption, or open question, so silence is never mistaken for approval at the 3-week baseline.

Why interviewers ask this: This tests whether the candidate can make decision ownership explicit early enough to keep analysis moving.

stakeholder-managementcommunicationworkflow-analysis

I would design an asynchronous-first cycle with short regional sessions and one controlled source of truth.

  • I would send a 10-minute process walkthrough and focused questions 48 hours before each session, then collect comments directly on the same BPMN model in Miro or Confluence.
  • I would run two mirrored workshops, publish one decision log within 24 hours, and give absent stakeholders a 2-business-day review window.
  • For the 5 cross-region decisions, I would propose candidate decision owners for sponsor confirmation, then schedule a final 60-minute overlap session rather than reopen every local detail.

Why interviewers ask this: A strong answer demonstrates a concrete remote elicitation rhythm that prevents attendance limits from creating conflicting requirement sets.

stakeholder-managementrequirements-elicitationrequirements

I would treat regulations and control evidence as primary requirement sources alongside stakeholder interviews.

  • In week 1, I would map each policy clause to the application step, data captured, responsible role, retention period, and evidence an auditor must be able to retrieve.
  • I would validate interpretations with compliance and legal, while operations demonstrates 10 real anonymized cases including approvals, declines, and manual reviews.
  • I would make every regulatory rule traceable to a requirement and test, and require named compliance approval before the 4-week baseline.

Why interviewers ask this: The interviewer is evaluating whether the candidate can preserve regulatory traceability without reducing elicitation to policy transcription.

warehouse

I would sample frontline evidence across shifts and compare it with management assumptions.

  • I would observe 3 pickers per shift through complete picks and interview them at the workstation, including one new hire and one experienced picker on each shift.
  • I would compare observed travel time, scan failures, and exception handling with the standard operating procedure and 4 weeks of system data.
  • I would play back discrepancies to managers and pickers together, labeling whether each requirement comes from policy, measured behavior, or a proposed improvement.

Why interviewers ask this: The interviewer wants to see a practical sampling strategy that exposes real work without expanding discovery beyond the deadline.

stakeholder-managementdesigncommunication

I would assess completeness against the product scope and models, not by counting documents or approvals.

  • I would walk every actor, trigger, main flow, alternate flow, business rule, data item, interface, permission, and measurable NFR through a coverage checklist.
  • I would trace the 120 requirements to 6 business objectives and 18 process steps, flagging objectives or steps with no supporting requirement or acceptance test.
  • I would run scenario reviews for a normal claim and the 5 highest-risk exceptions, then classify remaining gaps as design blockers, explicit assumptions, or later-scope items before day 5.

Why interviewers ask this: A strong answer separates evidence of requirement coverage from the false assurance of a large requirement count.

requirementsrequirements-documentsfunctional-specification

I would use a concise BRD for the agreed business scope and a linked functional specification for build detail.

  • The BRD would fix the 5 objectives, in-scope departments, target outcomes, policy constraints, and exclusions so the vendor cannot interpret features as the business goal.
  • The FRD would describe workflows, rules, data, roles, interface behavior, and measurable NFRs at the level needed for estimation and acceptance.
  • I would avoid duplicating text by giving every functional requirement an ID linked back to its BRD objective and forward to acceptance scenarios.

Why interviewers ask this: The interviewer is testing whether the candidate chooses documentation from contract and delivery needs instead of treating BRD and FRD as mandatory templates.

user-storiesuse-casesdesign

I would use a use case to control the end-to-end interactions and stories to slice delivery.

  • The use case would capture actors, preconditions, the normal return, 7 alternate paths, and postconditions across store, web, warehouse, and payment systems.
  • I would derive stories by valuable increments such as standard refund, exchange, damaged item, and manager override, each with acceptance examples.
  • I would keep the use case as the shared behavior model and link stories to its flows, avoiding two independently maintained versions of the same rule.

Why interviewers ask this: A strong answer matches each artifact to a delivery purpose and explains how to prevent duplicate specifications.

I would use a decision table to expose every meaningful condition combination and its outcome.

  • Rows would cover segment, basket threshold, promotion eligibility, stacking permission, and date validity, with actions for discount amount and rejection reason.
  • Based on the agreed stacking rule, I would choose an explicit DMN hit policy: Unique when exactly one rule may match, Priority when one outcome outranks another, or Collect when eligible promotions may stack; I would then test gaps and overlaps against that policy.
  • Product, finance, and QA would review examples at the boundaries, such as exactly $100 and one cent below, before the table becomes the implementation reference.

Why interviewers ask this: The interviewer is checking whether the candidate can turn dense business rules into a complete and testable model.

workflow-analysis

I would define states by stable business meaning and make every transition explicit.

  • For each of the 9 states, I would document allowed entry events, permitted next states, responsible actor, data changes, and whether the customer can still edit the application.
  • I would challenge ambiguous statuses such as pending by separating waiting for customer, waiting for bureau, and manual review when their rules or timers differ.
  • I would test the model with a standard approval, a decline, a withdrawal, and two resubmission paths, then link transitions to acceptance scenarios.

Why interviewers ask this: A strong answer shows that a state model controls behavior, permissions, and exceptions rather than merely listing labels.

data-dictionarysystem-design

I would make the dictionary the agreed business definition and mapping for each field.

  • Each of the 35 entries would include business name, precise definition, source, type and format, allowed values, nullability, owner, sensitivity, and transformation rule.
  • I would resolve terms such as customer, active, and primary address with examples because naming differences often hide different populations or time rules.
  • I would validate 20 sampled records through the mappings and record unresolved fields as assumptions with owners and dates rather than silently choosing one source.

Why interviewers ask this: The interviewer is assessing whether the candidate can make cross-system data meanings precise enough for design and validation.

requirementssystem-designtypes

I would specify the business exchange and failure expectations for every interface before discussing implementation details.

  • For each system, I would define trigger, sender and receiver, required fields, business validations, expected response, frequency or volume, and the authoritative source.
  • I would document duplicate, late, missing, and rejected messages with visible business statuses and ownership for resolution.
  • I would validate one successful booking and 6 interface exceptions as sequence diagrams or scenarios, then obtain agreement from product, operations, and each system owner.

Why interviewers ask this: A strong answer covers the information and business behavior at system boundaries without drifting into low-level engineering design.

stakeholder-managementcommunicationconcurrency

I would replace adjectives with thresholds tied to user journeys and business risk.

  • I would define p95 page or API response times for basket, payment initiation, and confirmation against a workload model covering 3,000 concurrent users, arrival rate, journey mix, and think time, with a separate maximum for the payment provider.
  • Availability would become a percentage and measurement window, such as 99.95% monthly excluding agreed maintenance, plus recovery time and recovery point targets.
  • I would confirm how each threshold and the workload model will be measured in a campaign-like load test and identify who accepts a missed threshold before launch.

Why interviewers ask this: The interviewer is evaluating whether the candidate can make non-functional expectations measurable, testable, and commercially meaningful.

requirements

I would translate privacy obligations into observable access, audit, and retention behavior.

  • I would define which of the 5 roles can view, create, amend, export, or delete each data category, including emergency access and approval rules.
  • I would define an audited-event catalog covering view, create, amend, export, delete, emergency access, and permission changes; 100% of those events would record actor, patient, action, timestamp, outcome, and reason where required, with an explicit policy-approved retention period and search SLA.
  • I would specify session timeout, failed-login lockout, consent withdrawal, and data deletion timelines as acceptance scenarios reviewed by privacy, security, and operations before week 3.

Why interviewers ask this: A strong answer turns broad security language into business-visible controls and verifiable outcomes.

requirementstestingrequirements-traceability

I would create bidirectional links that expose missing value, missing coverage, and unnecessary work.

  • Each objective would link to a measurable outcome, then to requirement IDs, design or story references, and one or more acceptance tests.
  • I would flag requirements with no objective, objectives with no requirements, requirements with no test, and tests that do not prove any requirement.
  • The review would focus first on high-risk many-to-many links and changed requirements, with owners assigned to close every blocker before day 5.

Why interviewers ask this: The interviewer is checking whether the candidate uses traceability to answer practical coverage questions rather than maintain a passive spreadsheet.

requirementsbusiness-rulesestimation

I would separate concerns into linked models and use scenario walkthroughs to test consistency.

  • A context and process model would set boundaries and handoffs, while state, decision, data, and permission models would each own one type of rule.
  • Stories would reference those shared rules instead of copying eligibility or status logic into 60 separate descriptions.
  • I would walk 8 representative scenarios through every model, recording contradictions in a single issue list with an owner and resolution date before refinement closes.

Why interviewers ask this: A strong answer demonstrates model-based consistency control rather than trying to solve contradictions with more prose.

concurrencyerror-handlingprocess-modeling

I would attach boundary events to the activity whose normal execution they interrupt or supplement.

  • An interrupting timer on 'Wait for documents' would route overdue claims to an escalation path after 48 hours and make the original wait stop.
  • A non-interrupting message boundary event could capture an additional document while assessment continues, if policy allows concurrent handling.
  • I would model the 6 exceptions only where their triggers and outcomes differ, then validate token behavior with operations so the diagram does not create duplicate active work.

Why interviewers ask this: The interviewer is assessing whether the candidate understands boundary event behavior well enough to model real exceptions accurately.

Locked questions

  • 21

    An online application waits for either customer documents, a cancellation request, or a 5-day timeout, and the process design is due tomorrow. How would you use an event-based gateway?

    designgatewayresilience
  • 22

    A fulfillment process has 42 activities repeated across 3 regions, and stakeholders need a readable BPMN model in 6 days. How would you use subprocesses?

    stakeholder-managementcommunicationconcurrency
  • 23

    A marketplace sends 20,000 orders per day to 3 logistics partners and receives asynchronous accept, reject, and delivery messages; the interface model is due in 2 weeks. How would you model message correlation?

    asynctypescorrelation
  • 24

    You have 2 weeks to document an as-is service process performed by 40 agents across 2 sites, but the procedure manual is 18 months old. What evidence would you collect?

    concurrency
  • 25

    Returns take 9 days against a 3-day target, and managers blame slow agents; you have 8 working days to analyze 500 recent cases. How would you separate root cause from symptom?

    root-cause-analysis
  • 26

    A 22-step supplier onboarding process must reach a 5-day cycle time from its current 12 days, and you have 10 days to complete a gap analysis. How would you proceed?

    gap-analysisonboardingconcurrency
  • 27

    A mortgage review has 12 handoffs, 4 approval queues, and 18% rework, and a Lean improvement workshop is scheduled in 1 week. How would you identify waste beforehand?

    facilitationdata-structures
  • 28

    A verification team receives 600 applications per 8-hour day, each requiring 9 minutes of work, and demand will rise 20% in 6 weeks. How would you assess capacity and queue risk?

    capacitydata-structures
  • 29

    A refund process crosses 7 teams, handles $2 million per month, and needs a controlled to-be design in 3 weeks. How would you analyze controls and handoffs?

    formsdesignconcurrency
  • 30

    You have 3 days to explain why 12% of 80,000 customers with paid orders have no onboarding call, using customer, order, and call tables. How would you structure the SQL analysis?

    onboardingsql
  • 31

    A 7-stage sales funnel contains 2 million events, and leadership needs a source-level conversion analysis by Friday. How would you use CTEs while keeping the logic reviewable?

    funnelfunnel-analysis
  • 32

    Support wants a 10-day analysis of response times for 300,000 tickets, including each team's weekly trend and the slowest 10% of cases. Where would window functions help?

    window-functions
  • 33

    A subscription product needs a 6-month retention view for 24,000 new customers before next week's planning session. How would you define the cohort analysis?

    retentioncohortssessions
  • 34

    A checkout funnel has 500,000 sessions per month and 5 tracked stages, and product needs drop-off findings in 5 working days. How would you build a trustworthy funnel?

    funnelfunnel-analysissessions
  • 35

    CRM, billing, and support contain 1.2 million customer records with no shared ID, and a duplicate estimate is due in 2 weeks. How would you define duplicates at BA level?

    estimation
  • 36

    The definition of a premium customer changed from $5,000 annual spend to $7,500 on July 1, affecting 18 months of reports that must be reconciled in 7 days. How would you handle the changing definition?

    data-reconciliation
  • 37

    ERP revenue is 2.4% higher than the CRM dashboard for the same quarter, covering 160,000 transactions, and finance needs a reconciled answer in 4 days. How would you investigate?

    data-reconciliationtransactions
  • 38

    Operations wants to publish a 'first-contact resolution' KPI for 50,000 monthly cases in 2 weeks. How would you validate the KPI and its data-quality rules?

    kpi-definitionvalidation
  • 39

    Regional managers need a Power BI or Tableau sales dashboard for 6 regions and 4 product lines in 4 weeks. What requirements would you define before development?

    birequirements
  • 40

    You have 2 weeks to test a new insurance-claim workflow with 6 user roles before engineering estimates it. What prototype fidelity would you choose?

    prototypingprototypesestimation
  • 41

    A scheduling prototype covers a 12-step workflow for dispatchers, technicians, and customers, and you have 5 days to validate it. How would you run the validation?

    prototypingprototypesjobs
  • 42

    A case-management product has 4 roles and 25 planned screens, and permission requirements must be ready in 8 working days. How would you validate permissions in wireframes?

    design-collabrequirementsvalidation
  • 43

    A payment flow has 12 screens and must be handed to design in 6 days, but current wireframes show only the happy path. Which error and edge states would you add?

    wireframesdesigndesign-collab
  • 44

    Ten warehouse users must validate a tablet picking prototype across 3 device sizes before build starts in 7 days. How would you turn feedback into requirement decisions?

    prototypingprototypesfeedback
  • 45

    A partner API must support 3 order actions and 8 business validation failures, and its contract review is in 10 days. What would you specify from the business viewpoint?

    validationapi
  • 46

    A nightly supplier file carries 50,000 records and 32 fields into a procurement system, and interface requirements must be approved in 2 weeks. How would you define the contract?

    requirementssystem-designtypes
  • 47

    You must recommend one of 3 case-management options within 8 working days: configure the current tool, buy a SaaS product, or build a custom module. How would you score them?

    configcloud
  • 48

    A self-service portal is expected in 6 weeks with a $180,000 budget, 2 engineers, and 5 external dependencies. How would you validate feasibility assumptions before confirming scope?

    feasibility-analysisdependenciesvalidation
  • 49

    A release has 45 functional requirements across 6 workflows and must agree its acceptance model in 1 week. How would you structure acceptance?

    requirementsworkflow-analysis
  • 50

    After 4 weeks of analysis, 95 requirements for a payroll feature must be baselined by Friday so 2 delivery teams can estimate consistently. What would the baseline contain?

    requirementsestimation
  • 51

    Sales wants phone number collection to be mandatory, while Support says it should remain optional; the current form has 18% abandonment across 12,000 monthly visits. How would you resolve the conflicting requirements?

    requirementsforms
  • 52

    Three department heads propose 4 different approval flows for a purchase request, and development needs one decision within 2 days. How would you facilitate it?

  • 53

    The decision owner is unavailable for 5 working days, but a team of 6 developers will be blocked in 48 hours by an unresolved refund-rule question. What do you do?

  • 54

    A stakeholder adds 6 new requests after a 24-point sprint has started, and the team has only 3 points of spare capacity. How do you handle the scope creep?

    soft-skillscommunicationscope
  • 55

    A change request adds 12 customer fields and a new validation service 3 weeks before release; the current forecast is 8 developer-days and 5 tester-days. How would you assess it?

    change-controlvalidation
  • 56

    Operations ranks a 20% reduction in handling time first, while Customer Service ranks a 15% reduction in repeat contacts first; the next release can fit only 12 of 20 backlog points. How do you settle the priority dispute?

    backlog-managementbacklog
  • 57

    A customer campaign fixes the launch date at 4 weeks, but the approved scope is estimated at 28 points and the team's demonstrated capacity is 20 points. What would you recommend?

    estimationcapacity
  • 58

    An external address API is now 10 days late, and your release is due in 3 weeks with 14 stories depending on it. How do you manage the dependency conflict?

    dependenciesapi
  • 59

    Team A can deliver a new order status in sprint 7, but Team B freezes its reporting release after sprint 6; 9 reports depend on that status. What do you recommend?

    agile
  • 60

    You have 25 UAT cases, 5 business testers, and 3 working days. How would you define ownership and execution?

    ownershipuat
  • 61

    A release has 80 UAT cases but capacity for only 45 before the deadline; 6 cases cover payment and refund paths. How would you set the strategy?

    estimationcapacityuat
  • 62

    Forty UAT cases require customer profiles, but the test environment contains only 12 usable profiles and none has a failed-payment history. What do you do?

    test-environmentsuat
  • 63

    The UAT environment fails with timeouts in 9 of 30 cases, while the same steps pass in the system test environment. How would you respond?

    system-designresiliencetest-environments
  • 64

    UAT produces 18 defects with only 2 days before the release meeting: 3 stop checkout, 7 have workable workarounds, and 8 are cosmetic. How do you triage them?

    defectsuat
  • 65

    During UAT, 7 of 50 cases fail because users expect bulk cancellation, but the signed requirement describes only single-order cancellation. Is this a defect or a requirement gap?

    defectsuatresilience
  • 66

    Fourteen defects were fixed after UAT round 1, and the regression suite contains 60 cases with 2 tester-days left. What would you rerun?

    regressiondefectsuat
  • 67

    After 72 of 75 UAT cases pass, Operations refuses sign-off over 3 failed reports, while the product owner says the release can proceed. How do you handle the disagreement?

    soft-skillsconflictuat
  • 68

    In UAT, 16 of 40 executed cases lack the build ID, tester, and evidence. How would you recover a trustworthy acceptance record?

    uat
  • 69

    Forty-five UAT cases were executed against the wrong release build and all passed. What do you do before go/no-go?

    governanceuat
  • 70

    A cross-team epic spans 3 products, 4 teams, and a proposed 6-week delivery window, but refinement keeps producing different assumptions. How would you refine it?

  • 71

    A 24-point epic for online returns is too large for a sprint, and the team proposes splitting it into UI, API, and database stories. How would you split it?

    agileapidatabase
  • 72

    A story depends on an unfamiliar vendor API, and estimates range from 5 to 18 points because nobody knows its rate limits or error behavior. What do you recommend?

    rate-limitingestimationprocurement
  • 73

    A feature crosses 4 teams and has 11 identified dependencies, but the plan lists only target dates. How would you make the dependency map actionable?

    dependencies
  • 74

    A story estimate changes from 8 to 21 points across 3 refinement sessions. How would you diagnose the churn?

    churnestimationsessions
  • 75

    On day 7, the acceptance criteria contain 4 mutually incompatible cancellation rules from different sources. What do you do?

    specsresilienceacceptance-criteria
  • 76

    Two weeks after release, 35 users report that a new search takes too many clicks, but analytics show completion improved from 62% to 70%. How would you act on the feedback?

    feedback
  • 77

    A vendor withdraws the API that underpins the Sprint Goal with 4 days left. How do you respond?

    agileprocurementapi
  • 78

    A vendor requires a signed specification 4 weeks before build, while your internal team works in 2-week sprints and expects requirements to evolve. How would you manage the hybrid handoff?

    agileprocurementrequirements
  • 79

    A BPMN model says every refund receives manager approval, but logs for 500 refunds show 22% skipped that step. How would you debug the discrepancy?

    process-modeling
  • 80

    A support process has a 4-hour SLA, but 31% of 2,400 monthly tickets miss it even though average handling time is 2.1 hours. How would you investigate?

    concurrency
  • 81

    An event retry creates duplicate shipment notifications for 1,800 of 60,000 records. How would you investigate and correct the behavior?

    resilience
  • 82

    An order marked Shipped in the warehouse appears as Processing in the customer portal for 14% of 3,000 daily orders. How would you debug the status mapping?

    warehouseconcurrency
  • 83

    The API accepts discounts up to 30%, but the approved business rule caps agents at 20%; 46 orders exceeded the cap last week. What would you do?

    business-rulesapi
  • 84

    Six API clients receive HTTP 400 without a business error code for 14 validation rules and retry each request 3 times. How would you improve the contract?

    httpresiliencevalidation
  • 85

    Customer onboarding time rose from 12 to 19 minutes after a release, but no single step shows an obvious error across 600 sessions. How would you find the root cause?

    root-cause-analysisonboardingsessions
  • 86

    A manual refund process produced 17 amount-entry errors in 3 months across 4 agents. What control would you design?

    designconcurrency
  • 87

    A nightly file integration sends 10,000 rows, but the target loads only 9,940 and reports no error for the missing 60. How would you debug and prevent recurrence?

  • 88

    A signup funnel drops from 68% completion to 49% at the identity step after a release, affecting about 4,000 weekly visitors. How would you investigate?

    funnelfunnel-analysis
  • 89

    Marketing defines a retained customer as active within 30 days of signup, while Product uses any activity in calendar month 2; their reports differ by 11%. How would you resolve the cohort conflict?

    cohorts
  • 90

    A dashboard week starts Sunday while Finance uses Monday, shifting 374 orders across months. How would you resolve the reporting mismatch?

  • 91

    Overall conversion rises from 40% to 43%, yet conversion falls in both mobile and desktop segments across 20,000 visits. How would you explain and investigate this?

  • 92

    Agents are measured on closing 35 tickets per day, and reopen rates have climbed from 8% to 17% in 6 weeks. What would you recommend?

  • 93

    A new scheduling feature targets 60% weekly adoption, but only 34% of 1,200 eligible users use it after 5 weeks. How would you diagnose the gap?

    decision-makingjobs
  • 94

    An A/B test with 18,000 users raises checkout completion from 71.0% to 72.2%, but average order value falls by 2.5%. How would you interpret it?

    ab-testingrevenue
  • 95

    Two days before a promised launch, analysis shows the core flow fails for 18% of mobile users and needs about 5 developer-days to fix. How would you communicate the bad news?

    communicationpromises
  • 96

    In a 90-minute workshop, 2 managers repeatedly interrupt each other and the group has resolved only 1 of 6 requirements after 40 minutes. What do you do?

    requirementsfacilitation
  • 97

    A junior analyst produces a 14-page requirement document for a 3-story feature, but developers still ask who can cancel an order and when. How would you mentor them?

    mentoring
  • 98

    A vendor's 38-page proposal says customer records are synchronized regularly, but your process requires updates within 15 minutes and the contract is due in 3 days. What do you do?

    procurementconcurrency
  • 99

    You have 5 working days to hand over a feature with 42 requirements, 9 open decisions, and 6 active defects to another analyst. How would you structure the handover?

    requirementsdefects
  • 100

    You are asked to improve your BA delivery over 1 quarter after 28% of stories entered sprints with unresolved questions and UAT found 11 requirement gaps. What metrics and actions would you choose?

    agilemonitoringuat